From empty plot to plaster-ready. Four stages, one written scope, no surprises halfway up the slab.


01
Foundation
Excavation, PCC, footings and plinth beam. Levels set to the structural drawing before anything goes up.


02
RCC structure
Columns, beams and slabs. Steel tied, shuttering set, concrete poured and cured to the agreed grade.


03
Brickwork
Walls raised as per the approved plan, with door and window openings framed to drawing.


04
Plaster
Internal and external plaster, cured and finished. Handed over ready for flooring, paint and interiors.